Framing gets inspected at three separate points during a Structural Rebuild project — before load transfer, after sheathing, and before drywall — because mistakes caught early are cheap and mistakes caught late aren't.
📞 Call +1-866-484-1409 Now
Framing checked before load transfer, after sheathing, and before drywall covers it.
Rebuilt sections meet today's Casselberry, FL building code, not a copy of decades-old framing.
One accountable GC oversees the entire project, not fragmented subcontractors.
A written price and milestone schedule before framing begins.

This is inspection point one — nothing proceeds until it clears.
Fire-damaged trusses replaced with engineered lumber matched to the original span and load rating.
Sheathing inspected once installed, the second of three checkpoints before anything closes up.
We manage this timeline so the project doesn't stall waiting on paperwork.
The third and final structural inspection happens right before drywall goes up.
You walk the finished property with us before we call it complete.
A project lead is assigned before the first visit even happens.
Initial findings shape the inspection checkpoints for the whole project.
You approve permits and milestones before framing starts.
Nothing closes out until final inspection actually passes.
"The sheathing inspection caught something that could easily have been hidden by the time drywall went up." — Homeowner, Casselberry
"Building to current code rather than replicating the original framing was reassuring, especially in an older house." — Homeowner, Casselberry, FL
"Having each stage inspected before it disappeared behind finish work meant there were no late surprises." — Homeowner, Casselberry
Each checkpoint catches something the next stage can't easily verify.
This often means your rebuilt sections are structurally stronger than before.
Yes, one GC oversees the entire project from framing through finish.
We manage the timeline so permitting doesn't stall construction.
Any issue found mid-project goes through the same written approval process.
Casselberry rebuild projects stay on schedule because permitting and inspections are managed directly.
