Framing gets inspected at three separate points during a Structural Rebuild project — before load transfer, after sheathing, and before drywall — because mistakes caught early are cheap and mistakes caught late aren't.
📞 Call +1-866-484-1409 Now
Framing checked before load transfer, after sheathing, and before drywall covers it.
Rebuilt sections meet today's Fort Myers, FL building code, not a copy of decades-old framing.
A single point of responsibility for the whole Fort Myers, FL rebuild.
A written price and milestone schedule before framing begins.

This is inspection point one — nothing proceeds until it clears.
Signed off by a structural engineer when the damage severity warrants it.
Sheathing inspected once installed, the second of three checkpoints before anything closes up.
We manage this timeline so the project doesn't stall waiting on paperwork.
The third and final structural inspection happens right before drywall goes up.
You walk the finished property with us before we call it complete.
A project lead is assigned before the first visit even happens.
The project lead arrives to evaluate structural scope and load conditions in person.
You approve permits and milestones before framing starts.
Construction proceeds through all three checkpoints to a final walkthrough.
"The sheathing inspection caught something that could easily have been hidden by the time drywall went up." — Homeowner, Fort Myers
"Knowing our rebuild was actually meeting current code instead of just matching what was there before gave us real peace of mind." — Homeowner, Fort Myers, FL
"The three-inspection process meant no surprises once the walls closed up — everything had already been checked and signed off." — Homeowner, Fort Myers
Each checkpoint catches something the next stage can't easily verify.
Current Fort Myers, FL code — older framing standards don't get replicated by default.
Yes, one GC oversees the entire project from framing through finish.
We manage the timeline so permitting doesn't stall construction.
Any issue found mid-project goes through the same written approval process.
Our Structural Rebuild teams cover Fort Myers and the surrounding zip codes, with licensed GC oversight on every project.
