Framing gets inspected at three separate points during a Structural Rebuild project — before load transfer, after sheathing, and before drywall — because mistakes caught early are cheap and mistakes caught late aren't.
📞 Call +1-866-484-1409 Now
Framing checked before load transfer, after sheathing, and before drywall covers it.
Rebuilt sections meet today's Richmond, KY building code, not a copy of decades-old framing.
One accountable GC oversees the entire project, not fragmented subcontractors.
Change orders require your signed approval, nothing added silently.

This is inspection point one — nothing proceeds until it clears.
Fire-damaged trusses replaced with engineered lumber matched to the original span and load rating.
Sheathing inspected once installed, the second of three checkpoints before anything closes up.
We manage this timeline so the project doesn't stall waiting on paperwork.
The third and final structural inspection happens right before drywall goes up.
You walk the finished property with us before we call it complete.
+1-866-484-1409 connects you to a live Richmond, KY dispatcher who books a structural evaluation.
The project lead arrives to evaluate structural scope and load conditions in person.
You approve permits and milestones before framing starts.
Construction proceeds through all three checkpoints to a final walkthrough.
"They caught a framing issue at the sheathing check that would've been buried behind drywall if we'd used a less thorough contractor." — Homeowner, Richmond
"Knowing our rebuild was actually meeting current code instead of just matching what was there before gave us real peace of mind." — Homeowner, Richmond, KY
"Having each stage inspected before it disappeared behind finish work meant there were no late surprises." — Homeowner, Richmond
Because issues caught early are cheap to fix; issues caught after drywall are expensive.
Current Richmond, KY code — older framing standards don't get replicated by default.
A single point of accountability for the whole scope.
Yes, all required permits are filed and scheduled with your local Richmond office.
Any issue found mid-project goes through the same written approval process.
Richmond rebuild projects stay on schedule because permitting and inspections are managed directly.
