Framing gets inspected at three separate points during a Structural Rebuild project — before load transfer, after sheathing, and before drywall — because mistakes caught early are cheap and mistakes caught late aren't.
📞 Call +1-866-484-1409 Now
Framing checked before load transfer, after sheathing, and before drywall covers it.
Older homes often benefit structurally from this upgrade.
One accountable GC oversees the entire project, not fragmented subcontractors.
A written price and milestone schedule before framing begins.

Compromised load-bearing walls rebuilt and checked before any load transfers back onto them.
Signed off by a structural engineer when the damage severity warrants it.
This step catches issues that only become visible once framing is skinned.
We manage this timeline so the project doesn't stall waiting on paperwork.
Once this clears, the framing is genuinely done — not assumed done.
Trim, doors, and final details completed once structural work is fully signed off.
+1-866-484-1409 connects you to a live Dassel, MN dispatcher who books a structural evaluation.
Initial findings shape the inspection checkpoints for the whole project.
You approve permits and milestones before framing starts.
Nothing closes out until final inspection actually passes.
"The sheathing inspection caught something that could easily have been hidden by the time drywall went up." — Homeowner, Dassel
"Building to current code rather than replicating the original framing was reassuring, especially in an older house." — Homeowner, Dassel, MN
"The three-inspection process meant no surprises once the walls closed up — everything had already been checked and signed off." — Homeowner, Dassel
Because issues caught early are cheap to fix; issues caught after drywall are expensive.
This often means your rebuilt sections are structurally stronger than before.
Yes, one GC oversees the entire project from framing through finish.
We manage the timeline so permitting doesn't stall construction.
Any issue found mid-project goes through the same written approval process.
Dassel rebuild projects stay on schedule because permitting and inspections are managed directly.
