Framing gets inspected at three separate points during a Structural Rebuild project — before load transfer, after sheathing, and before drywall — because mistakes caught early are cheap and mistakes caught late aren't.
📞 Call +1-866-484-1409 Now
Framing checked before load transfer, after sheathing, and before drywall covers it.
Rebuilt sections meet today's New Prague, MN building code, not a copy of decades-old framing.
One accountable GC oversees the entire project, not fragmented subcontractors.
Change orders require your signed approval, nothing added silently.

Compromised load-bearing walls rebuilt and checked before any load transfers back onto them.
Signed off by a structural engineer when the damage severity warrants it.
Sheathing inspected once installed, the second of three checkpoints before anything closes up.
We manage this timeline so the project doesn't stall waiting on paperwork.
The third and final structural inspection happens right before drywall goes up.
Trim, doors, and final details completed once structural work is fully signed off.
+1-866-484-1409 connects you to a live New Prague, MN dispatcher who books a structural evaluation.
Initial findings shape the inspection checkpoints for the whole project.
Full rebuild scope documented with a written price, schedule, and inspection plan.
Construction proceeds through all three checkpoints to a final walkthrough.
"They caught a framing issue at the sheathing check that would've been buried behind drywall if we'd used a less thorough contractor." — Homeowner, New Prague
"Knowing our rebuild was actually meeting current code instead of just matching what was there before gave us real peace of mind." — Homeowner, New Prague, MN
"The three-inspection process meant no surprises once the walls closed up — everything had already been checked and signed off." — Homeowner, New Prague
Each checkpoint catches something the next stage can't easily verify.
This often means your rebuilt sections are structurally stronger than before.
A single point of accountability for the whole scope.
Yes, all required permits are filed and scheduled with your local New Prague office.
Any issue found mid-project goes through the same written approval process.
Our Structural Rebuild teams cover New Prague and the surrounding zip codes, with licensed GC oversight on every project.
