Framing gets inspected at three separate points during a Structural Rebuild project — before load transfer, after sheathing, and before drywall — because mistakes caught early are cheap and mistakes caught late aren't.
📞 Call +1-866-484-1409 Now
Catching an issue at any of these points is far cheaper than after the walls close up.
Older homes often benefit structurally from this upgrade.
A single point of responsibility for the whole Shafer, MN rebuild.
Change orders require your signed approval, nothing added silently.

Compromised load-bearing walls rebuilt and checked before any load transfers back onto them.
Signed off by a structural engineer when the damage severity warrants it.
Sheathing inspected once installed, the second of three checkpoints before anything closes up.
We manage this timeline so the project doesn't stall waiting on paperwork.
Once this clears, the framing is genuinely done — not assumed done.
You walk the finished property with us before we call it complete.
+1-866-484-1409 connects you to a live Shafer, MN dispatcher who books a structural evaluation.
Initial findings shape the inspection checkpoints for the whole project.
Full rebuild scope documented with a written price, schedule, and inspection plan.
Nothing closes out until final inspection actually passes.
"The sheathing inspection caught something that could easily have been hidden by the time drywall went up." — Homeowner, Shafer
"Knowing our rebuild was actually meeting current code instead of just matching what was there before gave us real peace of mind." — Homeowner, Shafer, MN
"Having each stage inspected before it disappeared behind finish work meant there were no late surprises." — Homeowner, Shafer
Each checkpoint catches something the next stage can't easily verify.
This often means your rebuilt sections are structurally stronger than before.
Yes, one GC oversees the entire project from framing through finish.
Yes, all required permits are filed and scheduled with your local Shafer office.
Any issue found mid-project goes through the same written approval process.
Shafer rebuild projects stay on schedule because permitting and inspections are managed directly.
