Framing gets inspected at three separate points during a Structural Rebuild project — before load transfer, after sheathing, and before drywall — because mistakes caught early are cheap and mistakes caught late aren't.
📞 Call +1-866-484-1409 Now
Framing checked before load transfer, after sheathing, and before drywall covers it.
Rebuilt sections meet today's Riverdale, NJ building code, not a copy of decades-old framing.
One accountable GC oversees the entire project, not fragmented subcontractors.
A written price and milestone schedule before framing begins.

Compromised load-bearing walls rebuilt and checked before any load transfers back onto them.
Signed off by a structural engineer when the damage severity warrants it.
This step catches issues that only become visible once framing is skinned.
We manage this timeline so the project doesn't stall waiting on paperwork.
The third and final structural inspection happens right before drywall goes up.
You walk the finished property with us before we call it complete.
A project lead is assigned before the first visit even happens.
Initial findings shape the inspection checkpoints for the whole project.
You approve permits and milestones before framing starts.
Nothing closes out until final inspection actually passes.
"The sheathing inspection caught something that could easily have been hidden by the time drywall went up." — Homeowner, Riverdale
"Building to current code rather than replicating the original framing was reassuring, especially in an older house." — Homeowner, Riverdale, NJ
"The three-inspection process meant no surprises once the walls closed up — everything had already been checked and signed off." — Homeowner, Riverdale
Because issues caught early are cheap to fix; issues caught after drywall are expensive.
This often means your rebuilt sections are structurally stronger than before.
A single point of accountability for the whole scope.
Yes, all required permits are filed and scheduled with your local Riverdale office.
We stop, document it, and get your written approval before proceeding.
Riverdale rebuild projects stay on schedule because permitting and inspections are managed directly.
