Framing gets inspected at three separate points during a Structural Rebuild project — before load transfer, after sheathing, and before drywall — because mistakes caught early are cheap and mistakes caught late aren't.
📞 Call +1-866-484-1409 Now
Catching an issue at any of these points is far cheaper than after the walls close up.
Rebuilt sections meet today's Lebanon, OH building code, not a copy of decades-old framing.
One accountable GC oversees the entire project, not fragmented subcontractors.
Change orders require your signed approval, nothing added silently.

This is inspection point one — nothing proceeds until it clears.
Signed off by a structural engineer when the damage severity warrants it.
Sheathing inspected once installed, the second of three checkpoints before anything closes up.
Permits filed and scheduled directly with your local Lebanon building department.
Once this clears, the framing is genuinely done — not assumed done.
You walk the finished property with us before we call it complete.
A project lead is assigned before the first visit even happens.
Initial findings shape the inspection checkpoints for the whole project.
You approve permits and milestones before framing starts.
Nothing closes out until final inspection actually passes.
"They caught a framing issue at the sheathing check that would've been buried behind drywall if we'd used a less thorough contractor." — Homeowner, Lebanon
"Knowing our rebuild was actually meeting current code instead of just matching what was there before gave us real peace of mind." — Homeowner, Lebanon, OH
"The three-inspection process meant no surprises once the walls closed up — everything had already been checked and signed off." — Homeowner, Lebanon
Each checkpoint catches something the next stage can't easily verify.
Current Lebanon, OH code — older framing standards don't get replicated by default.
Yes, one GC oversees the entire project from framing through finish.
Yes, all required permits are filed and scheduled with your local Lebanon office.
Any issue found mid-project goes through the same written approval process.
Our Structural Rebuild teams cover Lebanon and the surrounding zip codes, with licensed GC oversight on every project.
