Framing gets inspected at three separate points during a Structural Rebuild project — before load transfer, after sheathing, and before drywall — because mistakes caught early are cheap and mistakes caught late aren't.
📞 Call +1-866-484-1409 Now
Framing checked before load transfer, after sheathing, and before drywall covers it.
Older homes often benefit structurally from this upgrade.
A single point of responsibility for the whole Austin, TX rebuild.
A written price and milestone schedule before framing begins.

This is inspection point one — nothing proceeds until it clears.
Signed off by a structural engineer when the damage severity warrants it.
This step catches issues that only become visible once framing is skinned.
We manage this timeline so the project doesn't stall waiting on paperwork.
Once this clears, the framing is genuinely done — not assumed done.
Trim, doors, and final details completed once structural work is fully signed off.
A project lead is assigned before the first visit even happens.
The project lead arrives to evaluate structural scope and load conditions in person.
Full rebuild scope documented with a written price, schedule, and inspection plan.
Nothing closes out until final inspection actually passes.
"They caught a framing issue at the sheathing check that would've been buried behind drywall if we'd used a less thorough contractor." — Homeowner, Austin
"Building to current code rather than replicating the original framing was reassuring, especially in an older house." — Homeowner, Austin, TX
"The three-inspection process meant no surprises once the walls closed up — everything had already been checked and signed off." — Homeowner, Austin
Because issues caught early are cheap to fix; issues caught after drywall are expensive.
Current Austin, TX code — older framing standards don't get replicated by default.
Yes, one GC oversees the entire project from framing through finish.
We manage the timeline so permitting doesn't stall construction.
We stop, document it, and get your written approval before proceeding.
Austin rebuild projects stay on schedule because permitting and inspections are managed directly.