Framing gets inspected at three separate points during a Structural Rebuild project — before load transfer, after sheathing, and before drywall — because mistakes caught early are cheap and mistakes caught late aren't.
📞 Call +1-866-484-1409 Now
Framing checked before load transfer, after sheathing, and before drywall covers it.
Older homes often benefit structurally from this upgrade.
One accountable GC oversees the entire project, not fragmented subcontractors.
Change orders require your signed approval, nothing added silently.

Compromised load-bearing walls rebuilt and checked before any load transfers back onto them.
Fire-damaged trusses replaced with engineered lumber matched to the original span and load rating.
This step catches issues that only become visible once framing is skinned.
Permits filed and scheduled directly with your local Keller building department.
The third and final structural inspection happens right before drywall goes up.
Trim, doors, and final details completed once structural work is fully signed off.
A project lead is assigned before the first visit even happens.
The project lead arrives to evaluate structural scope and load conditions in person.
Full rebuild scope documented with a written price, schedule, and inspection plan.
Nothing closes out until final inspection actually passes.
"The sheathing inspection caught something that could easily have been hidden by the time drywall went up." — Homeowner, Keller
"Building to current code rather than replicating the original framing was reassuring, especially in an older house." — Homeowner, Keller, TX
"The three-inspection process meant no surprises once the walls closed up — everything had already been checked and signed off." — Homeowner, Keller
Each checkpoint catches something the next stage can't easily verify.
This often means your rebuilt sections are structurally stronger than before.
A single point of accountability for the whole scope.
We manage the timeline so permitting doesn't stall construction.
Any issue found mid-project goes through the same written approval process.
Our Structural Rebuild teams cover Keller and the surrounding zip codes, with licensed GC oversight on every project.
