Framing gets inspected at three separate points during a Structural Rebuild project — before load transfer, after sheathing, and before drywall — because mistakes caught early are cheap and mistakes caught late aren't.
📞 Call +1-866-484-1409 Now
Framing checked before load transfer, after sheathing, and before drywall covers it.
Rebuilt sections meet today's New Market, VA building code, not a copy of decades-old framing.
One accountable GC oversees the entire project, not fragmented subcontractors.
Change orders require your signed approval, nothing added silently.

Compromised load-bearing walls rebuilt and checked before any load transfers back onto them.
Signed off by a structural engineer when the damage severity warrants it.
This step catches issues that only become visible once framing is skinned.
We manage this timeline so the project doesn't stall waiting on paperwork.
Once this clears, the framing is genuinely done — not assumed done.
Trim, doors, and final details completed once structural work is fully signed off.
A project lead is assigned before the first visit even happens.
The project lead arrives to evaluate structural scope and load conditions in person.
Full rebuild scope documented with a written price, schedule, and inspection plan.
Construction proceeds through all three checkpoints to a final walkthrough.
"The sheathing inspection caught something that could easily have been hidden by the time drywall went up." — Homeowner, New Market
"Building to current code rather than replicating the original framing was reassuring, especially in an older house." — Homeowner, New Market, VA
"Having each stage inspected before it disappeared behind finish work meant there were no late surprises." — Homeowner, New Market
Because issues caught early are cheap to fix; issues caught after drywall are expensive.
This often means your rebuilt sections are structurally stronger than before.
A single point of accountability for the whole scope.
We manage the timeline so permitting doesn't stall construction.
Any issue found mid-project goes through the same written approval process.
New Market rebuild projects stay on schedule because permitting and inspections are managed directly.
