Framing gets inspected at three separate points during a Structural Rebuild project — before load transfer, after sheathing, and before drywall — because mistakes caught early are cheap and mistakes caught late aren't.
📞 Call +1-866-484-1409 Now
Catching an issue at any of these points is far cheaper than after the walls close up.
Rebuilt sections meet today's Prescott, WI building code, not a copy of decades-old framing.
A single point of responsibility for the whole Prescott, WI rebuild.
A written price and milestone schedule before framing begins.

This is inspection point one — nothing proceeds until it clears.
Signed off by a structural engineer when the damage severity warrants it.
Sheathing inspected once installed, the second of three checkpoints before anything closes up.
Permits filed and scheduled directly with your local Prescott building department.
The third and final structural inspection happens right before drywall goes up.
You walk the finished property with us before we call it complete.
A project lead is assigned before the first visit even happens.
The project lead arrives to evaluate structural scope and load conditions in person.
Full rebuild scope documented with a written price, schedule, and inspection plan.
Nothing closes out until final inspection actually passes.
"They caught a framing issue at the sheathing check that would've been buried behind drywall if we'd used a less thorough contractor." — Homeowner, Prescott
"Knowing our rebuild was actually meeting current code instead of just matching what was there before gave us real peace of mind." — Homeowner, Prescott, WI
"Having each stage inspected before it disappeared behind finish work meant there were no late surprises." — Homeowner, Prescott
Because issues caught early are cheap to fix; issues caught after drywall are expensive.
Current Prescott, WI code — older framing standards don't get replicated by default.
A single point of accountability for the whole scope.
We manage the timeline so permitting doesn't stall construction.
We stop, document it, and get your written approval before proceeding.
Our Structural Rebuild teams cover Prescott and the surrounding zip codes, with licensed GC oversight on every project.
