Framing gets inspected at three separate points during a Structural Rebuild project — before load transfer, after sheathing, and before drywall — because mistakes caught early are cheap and mistakes caught late aren't.
📞 Call +1-866-484-1409 Now
Catching an issue at any of these points is far cheaper than after the walls close up.
Rebuilt sections meet today's Lebanon, NJ building code, not a copy of decades-old framing.
A single point of responsibility for the whole Lebanon, NJ rebuild.
A written price and milestone schedule before framing begins.

Compromised load-bearing walls rebuilt and checked before any load transfers back onto them.
Fire-damaged trusses replaced with engineered lumber matched to the original span and load rating.
Sheathing inspected once installed, the second of three checkpoints before anything closes up.
We manage this timeline so the project doesn't stall waiting on paperwork.
The third and final structural inspection happens right before drywall goes up.
Trim, doors, and final details completed once structural work is fully signed off.
A project lead is assigned before the first visit even happens.
Initial findings shape the inspection checkpoints for the whole project.
Full rebuild scope documented with a written price, schedule, and inspection plan.
Nothing closes out until final inspection actually passes.
"They caught a framing issue at the sheathing check that would've been buried behind drywall if we'd used a less thorough contractor." — Homeowner, Lebanon
"Building to current code rather than replicating the original framing was reassuring, especially in an older house." — Homeowner, Lebanon, NJ
"The three-inspection process meant no surprises once the walls closed up — everything had already been checked and signed off." — Homeowner, Lebanon
Each checkpoint catches something the next stage can't easily verify.
Current Lebanon, NJ code — older framing standards don't get replicated by default.
Yes, one GC oversees the entire project from framing through finish.
We manage the timeline so permitting doesn't stall construction.
We stop, document it, and get your written approval before proceeding.
Lebanon rebuild projects stay on schedule because permitting and inspections are managed directly.
