Framing gets inspected at three separate points during a Structural Rebuild project — before load transfer, after sheathing, and before drywall — because mistakes caught early are cheap and mistakes caught late aren't.
📞 Call +1-866-484-1409 Now
Framing checked before load transfer, after sheathing, and before drywall covers it.
Older homes often benefit structurally from this upgrade.
A single point of responsibility for the whole Argyle, TX rebuild.
Change orders require your signed approval, nothing added silently.

This is inspection point one — nothing proceeds until it clears.
Fire-damaged trusses replaced with engineered lumber matched to the original span and load rating.
This step catches issues that only become visible once framing is skinned.
We manage this timeline so the project doesn't stall waiting on paperwork.
Once this clears, the framing is genuinely done — not assumed done.
You walk the finished property with us before we call it complete.
A project lead is assigned before the first visit even happens.
Initial findings shape the inspection checkpoints for the whole project.
You approve permits and milestones before framing starts.
Nothing closes out until final inspection actually passes.
"They caught a framing issue at the sheathing check that would've been buried behind drywall if we'd used a less thorough contractor." — Homeowner, Argyle
"Knowing our rebuild was actually meeting current code instead of just matching what was there before gave us real peace of mind." — Homeowner, Argyle, TX
"The three-inspection process meant no surprises once the walls closed up — everything had already been checked and signed off." — Homeowner, Argyle
Because issues caught early are cheap to fix; issues caught after drywall are expensive.
This often means your rebuilt sections are structurally stronger than before.
Yes, one GC oversees the entire project from framing through finish.
Yes, all required permits are filed and scheduled with your local Argyle office.
Any issue found mid-project goes through the same written approval process.
Argyle rebuild projects stay on schedule because permitting and inspections are managed directly.