Framing gets inspected at three separate points during a Structural Rebuild project — before load transfer, after sheathing, and before drywall — because mistakes caught early are cheap and mistakes caught late aren't.
📞 Call +1-866-484-1409 Now
Catching an issue at any of these points is far cheaper than after the walls close up.
Older homes often benefit structurally from this upgrade.
One accountable GC oversees the entire project, not fragmented subcontractors.
Change orders require your signed approval, nothing added silently.

This is inspection point one — nothing proceeds until it clears.
Signed off by a structural engineer when the damage severity warrants it.
This step catches issues that only become visible once framing is skinned.
Permits filed and scheduled directly with your local Bethel building department.
The third and final structural inspection happens right before drywall goes up.
You walk the finished property with us before we call it complete.
A project lead is assigned before the first visit even happens.
The project lead arrives to evaluate structural scope and load conditions in person.
Full rebuild scope documented with a written price, schedule, and inspection plan.
Nothing closes out until final inspection actually passes.
"They caught a framing issue at the sheathing check that would've been buried behind drywall if we'd used a less thorough contractor." — Homeowner, Bethel
"Building to current code rather than replicating the original framing was reassuring, especially in an older house." — Homeowner, Bethel, WA
"Having each stage inspected before it disappeared behind finish work meant there were no late surprises." — Homeowner, Bethel
Each checkpoint catches something the next stage can't easily verify.
This often means your rebuilt sections are structurally stronger than before.
Yes, one GC oversees the entire project from framing through finish.
We manage the timeline so permitting doesn't stall construction.
Any issue found mid-project goes through the same written approval process.
Bethel rebuild projects stay on schedule because permitting and inspections are managed directly.