Framing gets inspected at three separate points during a Structural Rebuild project — before load transfer, after sheathing, and before drywall — because mistakes caught early are cheap and mistakes caught late aren't.
📞 Call +1-866-484-1409 Now
Framing checked before load transfer, after sheathing, and before drywall covers it.
Older homes often benefit structurally from this upgrade.
One accountable GC oversees the entire project, not fragmented subcontractors.
Change orders require your signed approval, nothing added silently.

This is inspection point one — nothing proceeds until it clears.
Fire-damaged trusses replaced with engineered lumber matched to the original span and load rating.
Sheathing inspected once installed, the second of three checkpoints before anything closes up.
We manage this timeline so the project doesn't stall waiting on paperwork.
Once this clears, the framing is genuinely done — not assumed done.
Trim, doors, and final details completed once structural work is fully signed off.
+1-866-484-1409 connects you to a live Baldwin, WI dispatcher who books a structural evaluation.
The project lead arrives to evaluate structural scope and load conditions in person.
Full rebuild scope documented with a written price, schedule, and inspection plan.
Construction proceeds through all three checkpoints to a final walkthrough.
"They caught a framing issue at the sheathing check that would've been buried behind drywall if we'd used a less thorough contractor." — Homeowner, Baldwin
"Building to current code rather than replicating the original framing was reassuring, especially in an older house." — Homeowner, Baldwin, WI
"Having each stage inspected before it disappeared behind finish work meant there were no late surprises." — Homeowner, Baldwin
Because issues caught early are cheap to fix; issues caught after drywall are expensive.
Current Baldwin, WI code — older framing standards don't get replicated by default.
Yes, one GC oversees the entire project from framing through finish.
Yes, all required permits are filed and scheduled with your local Baldwin office.
Any issue found mid-project goes through the same written approval process.
Our Structural Rebuild teams cover Baldwin and the surrounding zip codes, with licensed GC oversight on every project.