Framing gets inspected at three separate points during a Structural Rebuild project — before load transfer, after sheathing, and before drywall — because mistakes caught early are cheap and mistakes caught late aren't.
📞 Call +1-866-484-1409 Now
Catching an issue at any of these points is far cheaper than after the walls close up.
Rebuilt sections meet today's Centuria, WI building code, not a copy of decades-old framing.
One accountable GC oversees the entire project, not fragmented subcontractors.
Change orders require your signed approval, nothing added silently.

This is inspection point one — nothing proceeds until it clears.
Fire-damaged trusses replaced with engineered lumber matched to the original span and load rating.
This step catches issues that only become visible once framing is skinned.
We manage this timeline so the project doesn't stall waiting on paperwork.
Once this clears, the framing is genuinely done — not assumed done.
You walk the finished property with us before we call it complete.
+1-866-484-1409 connects you to a live Centuria, WI dispatcher who books a structural evaluation.
Initial findings shape the inspection checkpoints for the whole project.
Full rebuild scope documented with a written price, schedule, and inspection plan.
Construction proceeds through all three checkpoints to a final walkthrough.
"They caught a framing issue at the sheathing check that would've been buried behind drywall if we'd used a less thorough contractor." — Homeowner, Centuria
"Building to current code rather than replicating the original framing was reassuring, especially in an older house." — Homeowner, Centuria, WI
"The three-inspection process meant no surprises once the walls closed up — everything had already been checked and signed off." — Homeowner, Centuria
Each checkpoint catches something the next stage can't easily verify.
This often means your rebuilt sections are structurally stronger than before.
Yes, one GC oversees the entire project from framing through finish.
Yes, all required permits are filed and scheduled with your local Centuria office.
We stop, document it, and get your written approval before proceeding.
Centuria rebuild projects stay on schedule because permitting and inspections are managed directly.
