Framing gets inspected at three separate points during a Structural Rebuild project — before load transfer, after sheathing, and before drywall — because mistakes caught early are cheap and mistakes caught late aren't.
📞 Call +1-866-484-1409 Now
Framing checked before load transfer, after sheathing, and before drywall covers it.
Rebuilt sections meet today's Downing, WI building code, not a copy of decades-old framing.
One accountable GC oversees the entire project, not fragmented subcontractors.
A written price and milestone schedule before framing begins.

This is inspection point one — nothing proceeds until it clears.
Signed off by a structural engineer when the damage severity warrants it.
Sheathing inspected once installed, the second of three checkpoints before anything closes up.
We manage this timeline so the project doesn't stall waiting on paperwork.
The third and final structural inspection happens right before drywall goes up.
Trim, doors, and final details completed once structural work is fully signed off.
A project lead is assigned before the first visit even happens.
The project lead arrives to evaluate structural scope and load conditions in person.
You approve permits and milestones before framing starts.
Nothing closes out until final inspection actually passes.
"They caught a framing issue at the sheathing check that would've been buried behind drywall if we'd used a less thorough contractor." — Homeowner, Downing
"Building to current code rather than replicating the original framing was reassuring, especially in an older house." — Homeowner, Downing, WI
"Having each stage inspected before it disappeared behind finish work meant there were no late surprises." — Homeowner, Downing
Each checkpoint catches something the next stage can't easily verify.
Current Downing, WI code — older framing standards don't get replicated by default.
A single point of accountability for the whole scope.
We manage the timeline so permitting doesn't stall construction.
Any issue found mid-project goes through the same written approval process.
Our Structural Rebuild teams cover Downing and the surrounding zip codes, with licensed GC oversight on every project.
